VIKANI INTERMEDIATE
An Intermediate Section (often referred to as the Intermediate Channel or Main Runner layout) forms the backbone of a suspended ceiling grid. It runs perpendicular to the structural joists or slab above and directly supports the furring channels (cross tees) to which the ceiling boards or tiles are fixed.
Key Component Layers
Soffit Cleat / Anchor
The mechanical anchor (expansion anchor for concrete, or purlin clip for steel) fixed into the overhead structural substrate.
Suspension Rod / Hanger Wire
The vertical support member, typically a 4mm galvanized steel rod with an adjustable spring clip, or a 12-gauge hanger wire, suspended from the anchor.
Intermediate Channel (Main Runner)
The primary horizontal cold-rolled galvanized steel channel (commonly 38mm x 12mm x 0.9mm thick C-channel or heavy-duty T-bar) that spans the length of the room.
Connecting Clips
Specialized wire clips or locking tabs that bridge and lock the intermediate channel to the furring channels below at a perfect 90-degree angle.
Sizes Available
| Parameter | Available Specification |
|---|---|
| Length | 3660 MM & 2440 MM |
| Thickness | 0.50 MM |
Standard Technical Specifications
| Element | Professional Specification Requirement |
|---|---|
| Intermediate Channel Spacing | Maximum 1200mm center-to-center. |
| Hanger Wire Spacing | Installed along the intermediate channel at maximum 1200mm intervals. |
| Splicing / Overlap | A minimum 150mm overlap secured with at least two wafer-head screws or pop rivets when extending channels. |
| Steel Grade | Minimum Z180 / G300 galvanized steel to prevent rust and structural degradation. |
| Leveling Tolerance | Maximum deviation of ± 2mm over a 3-meter span across the entire grid. |